Water mitigation, mold remediation, and reconstruction were required subsequent a ruptured pipe and faulty sump pump. More than thirty inches of water accumulated. Mold formed on all surfaces and asbestos tiles were detected at the source. A complete mold remediation and asbestos abatement were completed. Akors successfully reconstructed and fully restored the entire structure.